Thermo-pride Oil Furnace (general service and maintenance) Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Autres Thermo-pride Oil Furnace (general service and maintenance). Thermo Pride Oil Furnace (general service and maintenance) User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 20
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
MO-425
ECN 4392-MA
OIL FURNACE
GENERAL SERVICE AND MAINTENANCE MANUAL
FOR USE WITH THERMO PRIDE OIL FURNACES
THERMO PRODUCTS, LLC.
PO BOX 217
NORTH JUDSON, IN 46366
PHONE: (574) 896-2133
Vue de la page 0
1 2 3 4 5 6 ... 19 20

Résumé du contenu

Page 1 - OIL FURNACE

MO-425 ECN 4392-MA OIL FURNACE GENERAL SERVICE AND MAINTENANCE MANUAL FOR USE WITH THERMO PRIDE OIL FURNACES THERMO

Page 2

All installations and services must be performed by qualified service personnel. 8 Fig. 8: Supply air duct sizing Example The RETURN AIR DUCT SYS

Page 3

All installations and services must be performed by qualified service personnel. 9 D. OIL TANK & PIPING: ????WARNING: All local codes and ordin

Page 4 - II. INSTALLATION

All installations and services must be performed by qualified service personnel. 10 Below the wiring diagrams for the various Thermo Pride oil furnac

Page 5

All installations and services must be performed by qualified service personnel. 11 G. INITIAL BURNER OPERATION: IMPORTANT: READ BURNER INSTRUCTION

Page 6

All installations and services must be performed by qualified service personnel. 12 For example, if a 13% CO2 (3.5% O2) is measured at a trace of smo

Page 7

All installations and services must be performed by qualified service personnel. 13 TURN T'STAT SETTINGABOVE ROOM TEMPERATURETURN THERMOSTAT TO

Page 8

All installations and services must be performed by qualified service personnel. 14 POSITION THEM PERBURNER MANUFACTURERSINSTRUCTIONSREPLACE IGNITIO

Page 9

All installations and services must be performed by qualified service personnel. 15 PROPER COMBUSTION ACHIEVED?IS THE PROBLEM DELAYEDIGNITION?IS PUM

Page 10

All installations and services must be performed by qualified service personnel. 16 GO TO PROPER COMBUSTIONACHIEVED SECTION ABOVEAND SET COMBUSTIONA

Page 11

All installations and services must be performed by qualified service personnel. 17 B. CAD CELL CHECKOUT PROCEDURE: 1. Remove cad cell lead wires,

Page 12

All installations and services must be performed by qualified service personnel. i TABLE OF CONTENTS SECTION

Page 13 - O analyzer

All installations and services must be performed by qualified service personnel. 18 ????CAUTION: Do not attempt to start burner when: 1.Excess oil

Page 14

All installations and services must be performed by qualified service personnel. 1 I. GENERAL INSTRUCTIONS - READ BEFORE START OF INSTALLATION 1. T

Page 15

All installations and services must be performed by qualified service personnel. 2 If the "entire" building is unusually tightly constructe

Page 16

All installations and services must be performed by qualified service personnel. 3 2. PREVENTION OF CHIMNEY CONDENSING: Stack gas may do one of two t

Page 17

All installations and services must be performed by qualified service personnel. 4 3. PROPER CHIMNEY HEIGHT: The chimney shall terminate at least 3

Page 18

All installations and services must be performed by qualified service personnel. 5 5. PROPER CHIMNEY BOTTOM LEVEL: In cases where the chimney extend

Page 19

All installations and services must be performed by qualified service personnel. 6 Fig. 7: Alternate constructions that allow reduced clearances to

Page 20

All installations and services must be performed by qualified service personnel. 7 The vent connector pipe between the furnace and chimney shall be o

Commentaires sur ces manuels

Pas de commentaire